Location
Baruth, Germany
Completion
2017
Client
Börgel GmbH & Co. KG / Ibbenbüren
Filling volume
3.500 m³
Formwork
formtec steel formwork in circular ring, pace 3 m
Concrete quality
Beton C35/45 LH/HS
Reinforcement
Crack width limitation wk = 0,1 mm
Leakage test
complete filling with water
Special aspect
Due to the high chemical attack of the filling medium, the inner wall and the floor of the container had to be equipped with a DIBT approved PEHD-Inliner.